摘要
建设单位合理地确定工程造价,不仅要对工程建设全过程进行造价控制,更要重视工程结算的审核环节。通过对工程结算全面、系统地检查和复核,及时纠正所存在的错误和问题,使之更加有效地控制工程造价,促进并保证项目目标管理的实现。
The construction units want to properly confirm the project costs,not only need to control the whole process costs,but also need to pay more attention to the cost check sessions.Via the fully systemtically check and review,correct the mistakes and problems in time,so to control the project costs moer effectively.
出处
《企业技术开发》
2012年第8期90-91,94,共3页
Technological Development of Enterprise
关键词
工程造价
控制
工程结算
审核
project cost
control
project settlement
examine and verify