摘要
通过对长洲水电厂综合厂用电影响因素的分析,探寻厂用电量优化控制的措施。对降低综合厂用电率,减少用网电量具有十分重要的意义。
Through the analysis on factors affecting the integrated station-service power consumption in Changzhou hydropower plant,to seek some optimized measures on controlling power consumption.It has great significance on decreasing integrated station-service power consumption rate.
出处
《红水河》
2012年第4期60-63,共4页
Hongshui River
关键词
综合厂用电
优化控制
长洲水电厂
integrated station-service power consumption
optimal control
Changzhou Hydropower plant