期刊文献+

钢管塔真型试验及结果分析

Real Model Test and Results Analysis on Steel Tube Tower
下载PDF
导出
摘要 通过各控制工况的加荷试验,测出有代表性的应变值和杆体变形值,检验其与理论计算结果的吻合程度和混合优选选材方法的正确性,分析连接部位的传力规律,根据真型试验测得的有关数据和宏观观察情况,检验铁塔的强度、刚度、插接深度和稳定性等是否满足设计要求。 To observe representative strain values and deformation values through load test under different control conditions,so as to check if they are coincident with theoretical calculations,verify the correctness of the hybrid optimal selection method and analyze the law for transmitted force at connected positions.Based on the data observed from real model test and macroscopic observations,to check if the strength,the rigidity,the inserted depth and the stability of the tower are in conformity with the design requirements or not.
作者 郭金晓
出处 《红水河》 2012年第4期86-89,105,共5页 Hongshui River
关键词 钢管塔 真型试验 steel tube tower real model test
  • 相关文献

参考文献4

二级参考文献3

  • 1DL/T5154-2002.架空送电线路杆塔结构设计技术规定[S].[S].,..
  • 2架空线路杆塔结构荷载试验(DL/TS99-2004)[S].
  • 3国网北京电力建设研究院.特高压交流J1转角塔试验报告,[R].2007.

共引文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部