摘要
介绍了五凤头桥改建工程的进度安排和进度保证措施,以及五凤头桥改建工程进度控制在实施中取得的成效。同时从公路工程施工进度控制的基本原理入手,结合洪山口-火石营线五凤头桥改建工程的施工实践,分析了如何处理进度、质量、成本以及安全之间的矛盾。
This paper has introduced the schedule and progress guarantee measures of Five - crested Bridge reconstruction project, and the schedule control achievements in implementation. Meanwhile, started from the basic principles of highway con-struction progress control, combined with the construction practices of the Hongshankou - Huoshiying line of Five - crested Bridge reconstruction project, analyzed how to deal with the contradiction between the progress, quality, cost and safety.
出处
《内蒙古公路与运输》
2012年第3期72-73,共2页
Highways & Transportation in Inner Mongolia
关键词
改建工程
进度控制
矛盾
保证措施
reconstruction project
schedule control
contradiction
guarantee measures