期刊文献+

地铁车站土建工程的风险与对策 被引量:4

Risk and Countermeasure of the Metro Station Construction
下载PDF
导出
摘要 针对地铁车站的特点,阐述了地铁车站施工中的基坑工程和结构工程,分别给出了这二者在设计和施工环节中的具体风险源和一些具体的风险防范对策。 In light of the feature of subway station, the paper analyses foundation pit construction of the metro station con-struction in the project, and introduces their respective risks and countermeasures in the design and construction of the metro station, which provide reference for similar construction.
作者 徐红
出处 《铁道建筑技术》 2012年第8期122-125,共4页 Railway Construction Technology
关键词 地铁车站 风险源 基坑工程 结构工程 metro station risk pit construction structural engineering
  • 相关文献

参考文献3

二级参考文献23

  • 1Johnson P.Evolution of risk concept.
  • 2Smelley P. The Importance of comprehensive risks management programs for large projects.
  • 3Clark G T.Addressing risk in seattle's underground.
  • 4Ott K R.A Risk assessment and analysis for an existing water conveyance tunnel.
  • 5Rozek J.Singapore's deep tunnel sewerage system:risk management form conceptual design to construction.
  • 6Brenner B.Design for construction mitigation on boston's central artery/tunnel projects.
  • 7Stepherd A.Systems engineering applications in railways.
  • 8Walter J Hinkel,etc. Underground Railways ‘yesterday today tomorrow' from 1863 upto the year 2000. compress verlag.
  • 9屈晓辉.秦沈客运专线主要设计技术[M].,..
  • 10BellDE schlerferAJr.风险管理[M].哈佛大学,..

共引文献70

同被引文献8

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部