Determination Method of Railway Construction Engineering Construction Total Duration
下载PDF
导出
摘要 铁路建设工程线长、点多、跨越区域广、建设环境复杂,涉及到线路、桥、隧及"四电"各专业,是一项系统工程。在开展施工组织设计时如何合理确定施工总工期,是一个重要课题。为完成好这一课题,须在分析各分项工程与施工工期的关系、影响施工总工期主要因素的基础上,根据建设环境和采用的主要技术标准,划分6种边界条件。并根据划分的6种边界条件,遵循一定的步骤和方法确定施工总工期。 Railway construction engineering is a system engineering. In developing the construction organization design, how to reasonably determine the construction total duration is an important subject. To complete this subject, it is necessary to divide 6 boundary conditions and follow the steps and method to determine the construction total duration based on analyzing the relationship each project and construction period and the main influencing factors of total duration and according to the construction environment and the main technical standards.
作者 江国君
出处 《铁路工程造价管理》 2012年第4期7-10,共4页 Railway Engineering Cost Management
关键词 铁路工程 施工工期 确定方法 Railway engineering Construction period Determination method
  • 相关文献

参考文献3

二级参考文献2

共引文献21

同被引文献22

  • 1铁建设[2004]45号,铁路建设项目工程总承包暂行办法[S].
  • 2中华人民共和国住房和城乡建设部.建标104-2008城市轨道交通工程项目建设标准[S].北京:中国计划出版社,2008.
  • 3中华人民共和国铁道部.铁建设[2006]113号铁路基本建设工程设计概(预)算编制办法[s].北京:中国标准出版社,2006.
  • 4铁道第三勘察设计院集团有限公司. 新建铁路北京至沈阳铁路客运专线望京隧道初步设计(送审稿)隧道及相关专业说明[Z]. 天津:铁道第三勘察设计院集团有限公司,2014.
  • 5中国铁路总公司. Q/ CR 9004-2015 铁路工程施工组织设计规范[S]. 北京:中国铁道出版社,2015.
  • 6铁道第三勘察设计院集团有限公司. 新建铁路北京至沈阳铁路客运专线望京隧道初步设计(送审稿)施工组织设计及总概算[Z].天津:铁道第三勘察设计院集团有限公司,2014.
  • 7中国铁路总公司. Q/ CR 9604-2015 高速铁路隧道工程施工技术规程[S]. 北京:中国铁道出版社,2015.
  • 8中国铁路总公司. Q/ CR9226-2015 铁路隧道工程施工机械配置技术规程[S]. 北京:中国铁道出版社,2015.
  • 9武汉铁四院工程咨询有限公司. 新建铁路北京至沈阳铁路客运专线现场核对情况报告(站前工程)[Z]. 武汉: 武汉铁四院工程咨询有限公司,2014.
  • 10武汉铁四院工程咨询有限公司. 新建铁路北京至沈阳铁路客运专线望京隧道初步设计咨询意见[Z]. 武汉:武汉铁四院工程咨询有限公司,2014.

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部