目的探讨生产过程中存在的职业病危害因素,采取有效的预防措施,保护从业人员的身体健康。方法依据相关标准和规范,采用现场职业卫生调查、职业卫生检测、职业健康监护等方法对该项目进行预评价。结果可比性较高的类比企业检测结果显示,有毒作业点、噪声作业点、高温作业点检测合格率分别为90.5%、96.2%、100.0%。结论该项目属于严重职业病危害项目,如果有针对性地强化防护措施,做好个人防护,可以预防职业病的发生。
Objective To understand the occupational hazards in the production process of the chemical company and take efficient measures to protect workers' health.Methods According to relative standards and regulations,the methods of field hygienic investigation,occupational detection and health examination were carried out.Results The analogical enterprise was chosen and monitoring results showed that the qualified rates of toxic work site,noise work site and high temperature worksite was 90.5%,96.2% and 100.0% respectively.Conclusion The project is a serious occupational hazard project.The occurrence of occupational diseases can be prevented,if protective measures and personal protection are strengthened.
出处
《中国卫生工程学》
CAS
2012年第4期309-310,313,共3页
Chinese Journal of Public Health Engineering
关键词
碳酸二甲酯
职业病
危害因素
预评价
Dimethyl carbonate
Occupational disease
Hazard factor
Pre-assessment