“引温入潮”工程是充分利用温榆河水资源,实现温榆河、潮白河之间水资源的优化配置、联合调度,近期解决潮白河环境用水问题,改善奥运场馆周边环境;远期对改善顺义新城、工业园区及内城水系的水资源状况等具有重要影响。从管道供水方式和管线纵断设计两方面对调压池与一级泵站相结合的输水方案进行分析论证,这一设计思路通过了实践检验获得了良好效果。可为类似工程提供借鉴。
The water transfer project from Wenyu River to Chaobai River could make full use of the Wenyu river water resources; and promote the water resources optional allocation and joint operation between the Wenyu River and Chaobal River. It could supply the water for environment of Chaobai river and improve the environment around the Olympic venues in short-term, and it could make important effects on improving the water resources of the Shunyi New City , industry park and the inner city water system in long term. The combination of pressure regulating tank and first-stage pumping station method was analyzed and demonstrated from two sides, one was the water supply mode in the pipeline, and the other was the longitudinal design of the pipeline. The design idea was successful in practical test and got good effect, it could provide reference for the similar projects.
出处
《南水北调与水利科技》
CAS
CSCD
北大核心
2012年第A02期118-120,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
引温入潮
玻璃钢管
管道
泵站
调压池
the water transfer project from Wenyu River to Chaohai River
FRP pipe
pipeline
pumping station
pressure regulating tank