摘要
江都站作为南水北调东线工程从长江取水的起点泵站,工程作用重要、运行十分频繁。本次按设计规划进行综合改造,涉及的工程数量多、范围广,施工对工程运行的影响较大,与运行的矛盾十分突出,为此,通过制订科学合理的总体实施方案、加强施工进度和安全管理、抓好工程调度运行管理、制订切实可行的应急措施等,妥善地处理了施工与运行的矛盾,在保证改造工程顺利实施的同时,工程效益也得到了充分发挥。
As the starting point station of the Eastern Route Project of the South-North Water Diversion,Jiangdu pumping station's engineering role is important with frequent operation The comprehensive updating according to design planning is involved in lots of engineering with wide range, The influence of the engineering construction on the operation is larger, and the contradiction between the construction and the operation is outstanding. Therefore, the measures including setting scientific and reasonable general implementation plan, strengthening the construction progress and security management, paying attention to the project scheduling operation management, formulating the feasible emergency measures, properly handling the contradiction between the construction and the operation are taken to ensure the smooth completion of the updating project and bring the engineering benefit into full play.
出处
《南水北调与水利科技》
CAS
CSCD
北大核心
2012年第A02期172-174,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
江都站
改造工程
施工与运行
矛盾
Jiangdu pumping station
renovation project
construction and operation
contradiction