期刊文献+

印度“7.30”、“7.31”大停电事故分析及启示 被引量:225

Analysis and Lessons of the Blackout in Indian Power Grid on July 30 and 31,2012
下载PDF
导出
摘要 2012年7月30和31日,印度发生了世界范围内影响人口最多的大规模停电事故。两次事故均起源于北部和西部电网400 kV联络线线路跳闸,随后发生的连锁故障导致电网崩溃,大停电事故对北部、东部、东北部造成严重影响。文中介绍事故前印度电网的运行状况及事故的起因、经过、恢复等情况,从技术、管理和体制方面分析事故发生的原因,并结合我国电网实际,提出保障电网安全稳定运行、防止大停电事故发生的建议。 On July 30 and 31, 2012, two widespread blackouts occurred in India. The blackouts affected the largest number of people so far. The two successive blackouts were both caused by the trip of a certain 400kV line of inter-regional corridors between northern and western grids. Subsequent faults resulted in breaking down of the power grids. The blackouts influenced the power supply of northern, eastern, and northeast grids. The pre-fault situation of Indian power grid, cause, spread, and restoration of the blackouts were described. Furthermore, the reasons of the blackouts were analyzed in detail from the aspects of technology, management and structure. Finally, certain suggestions to ensure the security and stability of China power grid and prevent the occurrence of blackout in China were proposed.
出处 《中国电机工程学报》 EI CSCD 北大核心 2012年第25期167-174,23,共8页 Proceedings of the CSEE
关键词 印度电网 大停电 安全稳定 统一调度 电力缺口 Indian power grid blackout security andstability centralized power dispatch shortage of electric power
  • 相关文献

参考文献14

二级参考文献106

共引文献1158

同被引文献2498

引证文献225

二级引证文献2820

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部