期刊文献+

考虑干湿循环路径的石灰改性红黏土路用性能试验研究 被引量:33

Experimental study of pavement performances of lime-treated laterite soil considering drying-wetting cycle paths
下载PDF
导出
摘要 红黏土是一种对环境湿、热变化敏感的高塑性黏土,用作路基填料时,为改善其路用性能,并延长路基使用寿命,工程中通常掺入一定剂量的石灰对其进行改性。在地下水、降雨入渗和蒸发等自然营力作用下,运营期间路基土的含水率反复变动会对其工程特性产生一定影响。采用两种与实际工况接近的典型干湿路径,开展红黏土及其石灰改性土的强度和变形特性对比试验研究。试验结果表明:均匀干湿循环作用下,石灰改性土的黏聚力减小,内摩擦角小幅度增大,抗剪强度略高于红黏土,改性效果不明显;定向干湿循环作用下,石灰改性土的收缩裂缝较少,强度和变形参数均显著提高,路用性能得到明显改善。 Laterite soil is one kind of high plastic clay being very sensitive to environmental heat and moisture variation,and mixing optimal ratio of lime into laterite soil is made when construction to improve pavement performance and prolong the life span.Engineering properties of subgrade are obviously affected by soil moisture state and its drying-wetting history during excavation and exertion of the expressway.Experimental investigations on strength and deformation properties of lime-treated laterite soil and laterite soil are carried out,considering two drying-wetting paths which are exactly accordant with practices.The results indicate that: with uniformity drying-wetting cycles,lime-treated soil,internal friction angle increase a little and cohesive strength decrease with shearing strength reducing and pavement performance has not improved greatly.With directional drying-wetting cycles,lime-treated soil have less drying-shrinking cracks with unconfined compression strength and deformation resistance decreasing a little and the long-term strength and deformation performance enhanced significantly.
出处 《岩土力学》 EI CAS CSCD 北大核心 2012年第9期2619-2624,共6页 Rock and Soil Mechanics
基金 交通部西部交通建设科技项目(No.200631878530)资助 湖南省交通运输厅2009年度科技进步与创新计划(No.200910) 湖北省自然科学基金(No.2011CDB407)
关键词 红黏土 干湿循环路径 石灰改性土 路用性能 laterite soil drying-wetting cycle path lime-treated soil pavement performance
  • 相关文献

参考文献10

  • 1赵颖文,孔令伟,郭爱国,拓勇飞.广西原状红粘土力学性状与水敏性特征[J].岩土力学,2003,24(4):568-572. 被引量:82
  • 2中华人民共和国行业标准编写组.JTGD30-2004公路路基设计规范[S].北京:人民交通出版社,2004.
  • 3HUANG Y H. Pavement analysis and design[M]. New York: Prentice Hall, 1993.
  • 4HALL D K, RAO S. Predicting subgrade moisture contem for low-volume pavement design using in situ moisture content data[J]. Transportation Research Record, 1999, 1652: 98-- 107.
  • 5SAWANGSURIYA, AUCKPATH. Stiffness-suction-moi- sture relationship for compacted soils[D]. Madison City: University of Wisconsin-Madison, 2006.
  • 6ZHANG CHAOHAN. The effect of high groundwater level on pavement subgrade performance[D]. Tallahassee: College of Engineering, The Florida State University, 2004.
  • 7HALIBURTON T ALLAN, DONALD R SNETHEN, LARRY K SHAW, et al. Subgrade moisture under Oklahoma highways[J]. Journal of Transportation Engineering Division, 1972, 98(2): 325--338.
  • 8KHOGALI WALAA ELDIN IBRAHIM. Assessing seasonal variations in cohesive subgrade soils[D]. Edmonton: University of Alberta, 1995.
  • 9中华人民共和国行业标准编写组.JTGE40-2007公路土工试验规程[S].北京:人民交通出版社,2007.
  • 10中华人民共和国行业标准编写组.JTGE51-2009公路工程无机结合料稳定材料试验规程[S].北京:人民交通出版社,2009.

二级参考文献13

  • 1周芳,陈世益.广西贵港红土风化壳的地球化学特征[J].中南矿冶学院学报,1994,25(2):151-155. 被引量:13
  • 2徐榴胜.红粘土在环境工程地质中的隐患[J].水文地质工程地质,1995,22(5):40-43. 被引量:10
  • 3唐大雄.第二界全国红土工程地质研讨会论文综述[A]..第二届全国红土工程地质研讨会论文集[C].贵州:贵州科技出版社,1991..
  • 4Frcdlund D G, Rahardjo H. Soil mechanics for unsaturated soils[M]. New York: John Wiley and sons. Inc. 1993.
  • 5Madu R M. An investigation into the geotechnical and engineering properties of some laterites of eastern Nigeria[J]. Engineering Geology, 1977. 11: 101 - 125.
  • 6Gao G R. The distribution and geotechnical properties of loess soils[A], lateritic soils and clayey soils in China[C].Engineering Geology, 1996, 42: 95- 104.
  • 7Delage P, Audiguier M, Cui Y J, Howat M D.Microstructure of a compacted silt [J]. Canadian Geotechnical Journal, 1996, 33:150- 158.
  • 8王毓华.中国红粘土特性、工程应用与研究展望[A]..区域性土的岩土工程问题学术讨论会论文集[C].南京:原子能出版社,1996.177-184.
  • 9谭罗荣.红土特性的微观基础[A]..全国第3届工程地质大会论文集[C].成都:成都科技大学出版社,1988.52-58.
  • 10姜洪涛.红粘土的成因及其对工程性质的影响[J].水文地质工程地质,2000,27(3):33-37. 被引量:80

共引文献95

同被引文献363

引证文献33

二级引证文献185

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部