摘要
以2×600 MW级机组为例,对各种接入220 kV分区电网的主接线方式进行分析和比较,探讨了1/2电气主接线方案,供有关各方参考。
This paper analyzes and compares various modes of main electric connection connected to 220 kV district grid based on 2x 600 MW units. In addition, it explores the 1/2 main connection scheme and can serve as a reference for relevant parties.
出处
《浙江电力》
2012年第8期42-44,71,共4页
Zhejiang Electric Power