4Tanenbaum Andrew S.计算机网络(3)[M].熊桂喜,王小虎译.北京:清华大学出版社,1999.
5郭梯云 邬国杨 李建东.移动通信[M].西安:西安电子科技大学出版社,2003,4..
6ASHOK S,BANERJEE R.Load-management Applications for the Industrial Sector.Applied Energy,2000,66(2):105-111.
7NEHRIR M H,LAMERES B J,GEREZ V.A Customerinteractive Electric Water Heater Demand-side Management Strategy Using Fuzzy Logic.In:Proceedings of 1999 Winter Meeting of IEEE Power Engineering Society,Vol 1.New York (NY,USA):1999.433-436.