期刊文献+

基于二维寻优的核电站松动件定位分析

Loose Parts Location Analysis Based on Two Dimensional Optimization
下载PDF
导出
摘要 为快速、准确地估算出核电站一回路松脱零部件的碰撞位置,提出了一种基于二维寻优的松动件定位方法。根据各个传感器与松动件碰撞位置关系,建立松动件定位分析模型,将松动件定位问题转化为一个二维寻优问题;采用遗传算法进行寻优,实现松动件的位置估计。该方法避免了波速测量误差对定位精度的影响,提高了估算精度。分别用提出方法与三角形定位法和扫描定位法处理松动件碰撞模拟实验数据,对比分析定位误差和计算耗时表明,所提出的方法具有更高的定位精度和计算效率。 In the purpose of estimating the impact location of loose parts quickly and accurately in nuclear power plant prime circuit, a locating method based on two-dimensional optimization is proposed. Loose part location analysis model, which converts the locating problem into an optimization one, is established according to the position relationship between the sensors and the impact point. Then the location can be estimated by solving the optimization problem using Genetic Algorithm. The locating accuracy is improved as the error of wave velocity measurement is avoided in the proposed method. To verify the validity, the proposed method, the triangle method and the scanning method are used to process the simulation experiment data respectively. Comparison of locating error and time costing prove that the proposed method can achieve higher accuracy and efficiency.
出处 《振动.测试与诊断》 EI CSCD 北大核心 2012年第4期572-576,687,共5页 Journal of Vibration,Measurement & Diagnosis
基金 国家自然科学基金资助项目(编号51175466) 浙江省钱江人才计划资助项目(编号:2011R10016) 国家重点基础研究发展计划("九七三"计划)资助项目(编号:2011CB706505)
关键词 松动件 定位分析 二维寻优 遗传算法 loose parts, location analysis, two dimensional optimization, genetic algorithms
  • 相关文献

参考文献8

  • 1Bechtold B, Kunz U. KUES' 95-The modern diagnos- tic system for loose parts monitoring[J]. Progress in Nuclear Energy, 1999, 34(3):221-230.
  • 2Figedy S, Oksa G. Modern methods of signal process- ing in the loose part monitoring system[J]. Progress in Nuclear Energy, 2005, 46(3):253-267.
  • 3Kim Y B, Kim S J, Chung H D, et al. A study on technique to estimate impact location of loose part us- ing wigner-ville distribution[J]. Progress in Nuclear Energy, 2003, 43(1-4): 261-266.
  • 4Park J H, Kim Y H. Impact source localization on an elastic plate in a noisy environment[J].Measurement Science and Technology, 2006, 17: 2757-2766.
  • 5Kryter R C, Shahrokhi F. Summary of studies on methods for detecting, locating, and characterizing metallic loose parts in nuclear reactor coolant system [R]// U. S. Nuclear Regulatory Commission Report NUREG/CR-2344. Springfield, U. S. Department of Commerce, 1981.
  • 6Park G Y, Cheon S W, Lee C K, et al. An estimation method for impact location of loose parts[J].Progress in Nuclear Energy, 2005, 48(2006): 360-370.
  • 7李兵,杨殿阁,郑四发,李克强,连小珉.基于遗传算法的动态优化波叠加噪声源识别方法[J].机械工程学报,2010,46(12):99-105. 被引量:11
  • 8张良安,梅江平,黄田.基于遗传算法的机器人自动化生产线缓冲区容量分配方法[J].机械工程学报,2010,46(11):101-106. 被引量:13

二级参考文献30

  • 1潘汉军,李加庆,陈进,张桂才,刘先锋.半自由场波叠加噪声源识别方法研究[J].中国机械工程,2006,17(7):733-737. 被引量:8
  • 2徐亮,毕传兴,陈剑,陈心昭.基于波叠加法的patch近场声全息及其实验研究[J].物理学报,2007,56(5):2776-2783. 被引量:31
  • 3HUANG Tian,LI Zhanxian,LI Meng.Conceptual design and dimensional synthesis of a novel 2-DOF translational parallel robot for pick-and-place operations[J].ASME Journal of Mechanical Design,2004,126(3):449-455.
  • 4ZHANG Liangan,MEI Jiangping.Reformation of the transfusion bags'secondary packaging line using parallel robot[C] //Institute of Electrical and Electronics Engineers,International Conference on Mechatronics and Automation,August 5-8,2007,Harbin Engineering University,Harbin.Helongjiang:IEEE,2007:2 043-2048.
  • 5MALATHRONAS J P,PERKINS J D,SMITH R L.The availability of a system of two unreliable machines connected by an intermediate storage tank[J].AIIE Transactions,1983,15(3):195-201.
  • 6YERALAN S,FRANCK W E,QUASEM M A.A continuous materials flow production line with station breakdown[J].European Journal of Operational Research,1986,27:289-300.
  • 7DALLERY Y,DAVID R.Approximate analysis of transfer lines with unreliable machines and finite buffers[J].IEEE Transactions on Automatic Control,1989,34(9):943-953.
  • 8SORENSEN K,GERRIT K,JANSSENS.Buffer allocation and required availability in a transfer line with unreliable machines[J].Production Economics,2001,74:163-173.
  • 9PAPADOPOULOS H T,VIDALIS M I.A heuristic algorithm for the buffer allocation in unreliable unbalanced production lines[J].Computers&Industrial Engineering,2001,41:261-277.
  • 10NAHAS N,AIT-KADI D,NOURELFATH M.A new approach for buffer allocation in unreliable production lines[J].Production Economics,2006,103:873-881.

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部