4Buzacott J A, Shanthikumar J G. Stochastic models of manufacturing systems [M]. New Jersey:Prentice Hall, 1993.
5Gross D, Miller.D R, Soland R M. A closed queueing network model for multi-echelon repairable item provisloning[J]. IEEE Transactions, 1983, 15(4) :344 - 352.
6Spanjer L, van Ommeren J C W, Zijm W H M. Closed-loop twoechelon repairable item systems [ J ]. OR Spectrum, 2005, 27 (2) : 369 - 398.
7Gross D, Gu B C, Soland R M. Iterative solution methods for obtaining the steady-state probability distributions of Markovian multi-echelon repairable item inventory systems [J ]. Computers and Operations Research, 1993, 20(9):817 - 828.
8[4]W David Kelton,et al.Simulation with Arena[M].The McGraw-Hill Companies,Inc,U.S.A,1998.
9[5]John E.Hammann,Nancy A.Markovitch.Introduction To Arena[A].In:C.Al'exopoulos,K.Kang and W.R.Lilegdon,eds.Proceedings of the 1995 Winter Simulation Conference[C].U.S.A:Systems Modeling Corporation,1995:519-523.
10[6]Vivek Bapat,David T.Sturrock.The Arena Product Family:Enterprise Modeling Solutions[A].In:S.Chick,P.J.Scinchez and D.Ferrin,eds.Proceedings of the 2003 Winter Simulation Conference[C].U.S.A:Rockwell Software,2003:210-213.