期刊文献+

考虑合同期的多类人员协同工作人力资源计划 被引量:3

Manpower Planning for Multi-Type Staff Collaboration with Contract Period Considered
下载PDF
导出
摘要 研究考虑合同期的多类人员协同工作的车间人力资源计划问题。对于定制型装备制造企业,它具有不同工作效率的多类人员,存在师徒约束的小组工作模式等特点。鉴于问题的复杂性,不仅考虑不同类型员工的工资、招聘和续聘费用,还考虑技术的传承和员工队伍的稳定性,通过建立的动态规划模型反映操作人员的聘任及工作模式,获得人力资源配置的结果,给出这类企业人力资源配置的优化方案。 With contract period considered,an investigation is conducted on manpower planning for multi-type staff collaboration environment.In customized equipment making companies,there are often multiple types of staffs with different working efficiencies.This situation is even further complicated by the working groups with master-apprentice constraints.Thus,in planning the manpower for such a complicated situation,it needs to consider not only the staffs' salaries and employment/unemployment costs,but also the technique inheriting and employee stability.For such a problem,a dynamic planning model which reflects staffs' employing and working types is developed.With this model,it can find a satisfactory configuration of human resources.A case problem is used to show the application of the proposed method.
出处 《工业工程》 北大核心 2012年第4期78-82,共5页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(50675039) 国家863计划CIMS资助项目(2006AA04Z132) 广东省自然科学基金团队资助项目(05200197) 广东省科技攻关资助项目(2004B10201030)
关键词 装备制造业 人力资源计划 师徒约束 equipment manufacturing company manpower planning master-apprentice constraints
  • 相关文献

参考文献15

  • 1Edwards J S. A survey of manpower planning models and their application[J]. The Journal of the Operational Research Society,1983,34(11): 1031-1040..
  • 2Rao P. A dynamic programming approach to determine optimal manpower recruitment policies[J].The Journal of the Operational Research Society, 1980,41(10): 983-988..
  • 3Easton F F, Rossin D F. Equivalent alternate solutions for the tour scheduling problems[J].Decision Sciences ,1999,22(5):985-1007..
  • 4Bartholdi J J.A guaranteed accuracy round-off algorithm for cyclic scheduling and set covering[J].Operations Research.1981,29(3):501-510.
  • 5Azadeh A.[J].Anvari M. Implementation of multivariate methods as decision making models for optimization of operator allocation by computer simulation in CMS[C]. Proceedings of SCSC06.Canada:Calgary.2006,:-.
  • 6Antonella Certa, Mario Enea.Multi-objective human resources allocation in R&D projects planning[J]. International Journal of Production Research.2009,47(13):3503-3523..
  • 7Cai X,Li K N.A genetic algorithm for scheduling staff of mixed skills under multi-criteria[J].European Journal of Operation Research.2000,125(2):359-369.
  • 8Li Yong-jian,Chen Jian,Cai Xiao-qiang.Optimal manpower planning decision with single employee type considering minimal employment period constrant[J].Asia-Pacific Journal of Operational Research.2010,27(3):411-.
  • 9Askin R G, Huang Y. Employee training and assignment for facility reconfiguration[C]. USA:Council of Industrial Engineering,1997:426-431.
  • 10Bhaskar K, Srinivasan G. Static and dynamic operator allocation problems in cellular manufacturing systems[J].International Journal of Production Research, 1997, 35(12), 3467-3481..

同被引文献23

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部