期刊文献+

基于粗糙聚类的航空制造企业零件生产周期分析 被引量:3

Cycle Time Analysis for Air Plane Part Production Based on Rough Clustering
下载PDF
导出
摘要 航空制造企业的零件生产周期波动较大,将基于粗糙集理论的k-means聚类应用于零件生产周期研究,通过周期类上、下近似方法刻画企业实际生产周期样本的归属,并将不同类别的周期表达为一种覆盖关系;实例仿真结果表明该算法能为企业制定期量标准、均衡生产提供决策依据。 Usually,production cycle time for air plane parts has a significant fluctuation.Thus,it is omportant to accurately estimate such a cycle time.To do so,an advanced k-means clustering algorithm based on rough set theory is proposed for cycle time analysis.With the proposed algorithm,the actual samples are clustered with respect to production cycle time by using upper approximation,lower approximation,and overlapping relationship between clusters.Simulation results for practical instances indicate that the cycle time obtaied by the proposed algorithm is useful for production scheduling and capacity planning.
出处 《工业工程》 北大核心 2012年第4期119-123,135,共6页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(51075337)
关键词 生产周期 离散制造 粗糙集理论 K-MEANS聚类 production cycle time Job-shop rough set theory k-means clustering
  • 相关文献

参考文献4

二级参考文献23

  • 1罗志清,王润孝,雷建,姜晓鹏,崔怡.机械制造辅助加工时间定额研究[J].机床与液压,2004,32(12):62-64. 被引量:21
  • 2王军强,孙树栋,韩光臣,孙强.基于组件的可集成车间生产BOM管理系统[J].计算机集成制造系统,2006,12(4):609-615. 被引量:11
  • 3Moses S, Grant H, Gruenwald L, et al. Real- time Due date Promising by Build--to order Environments[J].International Journal of Production Research, 2004,42(20) :4353-4375.
  • 4Duenyas I, Hopp W J. Quoting Customer Lead Times[J]. Management Science, 1995,41 (1) :43- 57.
  • 5Spearman M L, Zhang R Q. Optimal Lead Time Policies[J].Management Science,1999,45(2) :290- 295.
  • 6Weng Z K. Strategies for Integrating Lead Time and Customer- order Decisions[J].IIE Transactions,1999,31(2) :161-171.
  • 7Hopp W J, Sturgis M R. A Simple, Robust Leadtime--quoting Policy[J].Manufacturing & Service Operations Management, 2001,3 ( 9 ) : 321-336.
  • 8Gordon V, Proth J, Chu C. A Survey of the State --of--the--art of Common Due Date Assignment and Scheduling Research[J]. European Journal of Operational Research, 2002,139 ( 1 ) : 1-25.
  • 9De P, Ghosh J B, Wells C E. Optimal Due--date Assignment and Sequencing[J]. European Journal of Operational Research, 1992,57(3) :323-331.
  • 10Roman D B, Valle A G. Dynamic Assignation of Due--dates in an Assembly Shop Based in Simulation[J]. International Journal of Production Research,1996,34(6):1539-1554.

共引文献25

同被引文献22

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部