摘要
随着高校建设规模扩大,基建投资成为高校管理工作的重点。从基建管理者角度,探讨如何用"全员教育"和"全环节控制"的"双全法"控制工程造价。从设计方案的确定、施工队伍的选择、材料的采购供应、施工过程的控制、预结算的审核等方面说明"双全"法在基建投资管理中的具体运用和重要意义,阐述以设计阶段为重点,技术与经济相结合的工程造价全过程动态控制方法。结合高校基建的特点,强调"阳光招标"的重要性。
With the constant expansion of the college construction, capital cost has become the focus of the university management. This paper discusses how to use “the Shuangquan Method” (i.e. “full education” and “all aspects of control”) to control project cost from the infrastructure manager's viewpoint. From the determination of the design, construction team selection, procurement and supply of materials, construction process control, checking of pre-settlement illustrates, this paper explains the concrete application and the importance of on the design stage of “the Shuangquan Method” in the management of capital cost, and expatiates the whole process of dynamic control methods of project cost that is a combination of technology and economy. Combined with the characteristics of the university infrastructure, this paper stresses the importance of the “Sunshine Bidding”.
出处
《建筑技术》
2012年第9期834-837,共4页
Architecture Technology
基金
河南省软科学计划研究项目(112400440039)
河南省政府决策研究招标课题(2011B543)
关键词
高校基建
投资管理
全过程控制
全员教育
capital construction of university
investment management
the whole process control
fulleducatio