A^2/C氧化沟工艺升级改造工程的设计及运行 被引量:3

Design and Operation of Upgrading and Retrofitting Project of A^2/C Oxidation Ditch Process
原文传递
导出
摘要 崇州污水处理厂升级改造工程要求出水水质执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)中的一级A标准。经多方案比较后,确定在保留现有的A2/C卡鲁塞尔氧化沟系统的基础上,对氧化沟、储泥池进行水力改造,并增加纤维转盘过滤工艺。该改造工程具有土建投资省、施工周期短的特点,运行监测表明大幅度降低了出水SS值,并减小了出水BOD5、TP含量,出水水质优于一级A标准。 The upgrading and retrofitting project of Chongzhou WWTP required the effluent quality to meet the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918 -2002). After comparison of various schemes, hydraulic transformation for the oxidation ditch and sludge reservoir basins was performed, and rotary fibre disk filtration process was added on the basis of retaining the existing A2/C oxidation ditch system. The project had characteristics of low civil engineering investment and short construction cycle. The operation monitoring showed that the SS was significantly reduced, and the BOD5 and TP were decreased. The effluent quality was better than the first level A criteria.
出处 《中国给水排水》 CAS CSCD 北大核心 2012年第18期51-53,共3页 China Water & Wastewater
基金 四川省科技厅应用项目(10204110) 西华大学人才培养与引进项目(R0920408)
关键词 污水处理厂 升级改造 纤维转盘过滤 wastewater treatment plant upgrading and retrofitting rotary fibre disk filtration
  • 相关文献

参考文献4

二级参考文献8

共引文献18

同被引文献49

引证文献3

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部