摘要
针对我国大型浮顶罐建造工程中存在的有待完善之处,以10万m3浮顶罐为例,从设计和施工两方面(包括加热除蜡装置、汉密封装置、罐底板下表面防腐以及施工作业顺序等)总结了改进经验。
In view of the imperfect existing in our country's large floating roof tanks construction, modifica- tion experience in terms of engineering and construction (including heater dewaxing equipment, dual sealing installation, anticorrosion on underside of bottom plates and erection sequence) is summarized ,by taking a 100, 000m3 floating roof tank as an example.
出处
《石油工程建设》
2000年第3期16-17,共2页
Petroleum Engineering Construction