摘要
文章首先探讨了当前国有煤矿矿区建筑工程造价管理存在的问题,然后提出了基于全过程的国有煤矿矿区建筑工程造价管理措施:立项决策阶段的造价控制、设计阶段的造价控制、施工阶段的造价控制和后评估阶段的造价控制。具有一定的借鉴意义。
This paper first discusses the state-owned coal mine construction project cost management problems, and then puts forward state-owned coal mine construction project cost management measures based on the whole process: the project decision stage construction cost control, cost control of design stage, construction stage consti'uction cost control and the assessment phase of cost control.
出处
《煤炭技术》
CAS
北大核心
2012年第9期105-106,共2页
Coal Technology
关键词
国有煤矿矿区
建筑工程
造价控制
全过程
state-owned coal mining area
construction project
cost control
whole process