期刊文献+

洪水场次的界定 被引量:1

Study on criterion and definition of flood
原文传递
导出
摘要 人们在进行洪水频率计算时,人为地割裂了洪水过程。一般地,都是以每年的最大洪峰流量对应的洪水作为该年的洪水过程,因此会出现洪水过程遗漏现象。洪水频率结果为防洪工程的建立提供依据,而洪水场次的界定是洪水频率计算的基础。文中研究采用两种方式界定洪水场次,利用Gumbel-Logistic模型分别计算界定的洪水场次的频率结果,并与传统方式下获取的洪水场次的频率结果进行比较。结果表明:3种情形下的洪水频率结果存在较大的差异。其中,以P-III型分布得出6年重现期的洪峰流量为洪水场次选取的门限值获得的洪水场次,即利用本研究中的界定方式二,得到的最大洪峰流量对应的频率值偏低,依此设计防洪工程,相比采用另外两种洪水场次选取方式进行防洪工程的设计偏于安全。 Generally in calculating the flood frequency,the flood processes often have been separated.The definition of the flood process is the basis for the calculation of flood frequency,which provides evidence for the flood control works.The flood frequencies have been calculated by Gumbel-Logistic model for the different flood processes in this study.The research results showed the results of the flood frequencies existed great difference under the three conditions.We depicted the second method to define the peak flood threshold(Q= 3536.67m 3 / s),which corresponding to six years of the return period by P-III type distribution.According to the second method,56 floods have been obtained.The lower frequency values of the method is more safety for design of flood control works.
出处 《干旱区资源与环境》 CSSCI CSCD 北大核心 2012年第10期36-40,共5页 Journal of Arid Land Resources and Environment
基金 国家重点基础研究发展计划(973)项目(2010CB428405) 国家自然科学基金重点项目(50839005) 国家自然科学基金资助项目(41001019) 广东省自然科学基金博士启动项目(S2011040005992) 广东高校优秀青年创新人才培养计划(育苗工程)项目(LYM11049) 教育部高等学校博士学科点专项科研基金新教师类资助课题(20114407120006)资助
关键词 洪水 频率 门限值 防洪工程 flood frequency threshold value flood control project
  • 相关文献

参考文献8

二级参考文献54

共引文献55

同被引文献21

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部