摘要 在小型水电站增效扩容改造中,水轮发电机和电气设备的选型设计是非常重要的部分,但往往没有得到足够地重视。如果发电机和电气设备不能与水轮机增效扩容相适应,将会给电站的安全可靠和经济运行带来隐患,也难以真正达到增效扩容的目的。本文主要针对小型水电站水轮发电机和电气改造设计中应该注意的关键问题进行了探讨。 Abstract: In the work of synergistic expansion and renovation of small hydropower station, the selection and design of hydroelectric generating synergies expansion and electrical equipment belong to very important part, but they often obtain inadequate attention. If the generators and electrical equipment can not adapt to turbine efficiency expansion, potential threat will be given to secure, reliable and economic operation of the power station in the future, and it is also difficult to actually reach the synergistic expansion purposes. This paper discuss the key issues in design of the generator and electrical transformation of small hydropower station.
作者 穆建军
出处 《中国水能及电气化》 2012年第9期7-11,共5页 China Water Power & Electrification
关键词 小型水电站 增效扩容 电气设计 small hydropower station synergistic expansion electrical design
  • 相关文献

参考文献2

  • 1SLl93-1997小型水电站技术改造规程[S].北京:中国水利水电出版社,1998.
  • 2李经禄.接地装置的运行与改造[M].北京:中国水利水电出版社,2005.

共引文献1

同被引文献18

引证文献7

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部