6小库珀H H,雅各布C E. 评价地层参数和概括井区历史的通用图解法[A]. 见:张宏仁编. 地下水非稳定流理论的发展和应用[C]. 北京:地质出版社,1975.(Cuber H H,Jacob C E. A Current Analytical Method to Evaluating Stratum Parameter and Generalizing History of Well Field[A]. In:Zhang Hongren ed. Development and Application of Underground Water Non-stable Flow Theory[C]. Beijing:Geological Press,1975.(in Chinese))
7卢时望.裘布依R解析法探讨[J].水文地质工程地质,1985,(6):48-50.
8婉愉.泰斯公式的有关理论和实践[J].水文地质工程地质,1985,(3):22-24.
9Bobet A. Effect of pore water pressure on tunnel support during static and seismic loading[J]. Tunneling and Underground Space Technology,2003,(6):13-16.
10Dahlo T,Evans K F,Halvorsen A,et al. Adverse effects of pore-pressure drainage on stress measurements performed in deep tunnel:an example from the Lower Kihansi hydroelectric power project of Tanzania[J]. International Journal of Rock and Mining Sciences,2003,(40):65-93.