摘要
介绍长江三峡水轮发电机组关键技术基础性研究中 5大课题的研究成果 ,指出其对于提高我国水轮机生产企业的竞争力所起到的积极推动作用。
The achievements in the basic researches on five major technical subjects in connection with the hydraulic power generating sets for the three gorge project are described, and their positive roles in improving the competitiveness of the Chinese hydraulic power generating set manufactures are highlighted.
出处
《黑龙江电力》
2000年第1期62-63,共2页
Heilongjiang Electric Power
关键词
水轮发电机组
优化设计
三峡工程
推力轴承
hydraulic power generating set
optimum design
stability of system
turbine manufacturing processes
quality control
cooling technique