FOXBORO系统DCS升级改造及相关问题处理 被引量:2

FOXBORO DCS Upgrading and Its Related Problems Handling
下载PDF
导出
摘要 内蒙古京隆发电有限责任公司1号、2号机组FOXBORO系统DCS改造前存在控制器负荷率超标、系统多次发生通信中断或死机故障等问题。通过对相关控制器通信点的组态进行优化、对DCS数据及网络进行升级改造,同时规范了操作员的操作习惯等,提高了DCS运行的安全稳定性。改造后,控制器的负荷率满足了国家标准的要求。 No.1 and No.2 units FOXBORO DCS of Inner Mongolia Jinglong Electric Power Company exist issues of the controller's load rate overproof, and the communication system interruption or failure. After the transformation of opitmizing, controllerJs load rate could meet the requirements of the national standards, and improve the stability of units operation; the controller communication point configuration upgrading the DCS data and network, and specificating operator's operation habit and other measures, improved the running safety and stability of DCS.
出处 《内蒙古电力技术》 2012年第4期58-61,共4页 Inner Mongolia Electric Power
关键词 FOXBORO系统 DCS 控制器 通信负荷 数据包 组态 FOXBOROsystem DCS load configuration controller communication load data packets
  • 相关文献

参考文献3

  • 1国家电力行业热工自动化标准化技术委员会.DL/T659--2006火力发电厂分散控制系统验收测试规程[s].北京:中国电力出版社,2007:2-6.
  • 2电力行业电力规划设计标准化技术委员会.DL/T5428-2009火力发电厂热工保护系统设计技术规定[S].北京:中国电力出版社,2009:43-46.
  • 3李树春,苟小龙.火力发电厂集控运行[M].重庆:重庆大学出版社,2006:230-237.

共引文献2

同被引文献10

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部