摘要
随着建筑施工技术的迅速发展,建筑结构和造型的不断变化,在市场经济的大环境下,建筑施工附着升降脚手架在国内建筑领域的应用逐渐增多。结合杭州市某大厦工程,深入分析了爬模架工程难点以及爬模架设计,介绍了该工程中爬模架技术难点解决方法及施工中问题解决方案。在高层建筑施工中,采用液压互爬式附着升降脚手架施工具有施工速度快、操作简洁、确保工程质量、降低成本的特点。
With the rapid development of construction technology,building structures and shapes keep changing.Under the environment of market economy,the application of attached self-lifting scaffold increases gradually in domestic construction field.With reference to a building project in Hangzhou,the authors analyzed the construction difficulties and design scheme of the climbing formwork,introduced the solution method for the technical difficulties of the climbing formwork and solution in problems occurred during construction.In high rise building constructions,the use of hydraulic climbing attached self-lifting scaffold can increase the construction speed,simplify the operation,ensure engineering quality and reduce the cost.
出处
《施工技术》
CAS
北大核心
2012年第9期70-72,共3页
Construction Technology
关键词
高层建筑
脚手架
模板
施工技术
tall buildings
scaffolds
formwork
construction