摘要
结合赵庄煤矿铁路专用线公路专用桥工程实践,介绍了先张法施工预应力桥梁板的关键环节、施工工艺及安全措施,指出应对施工全过程进行严格把关,以确保施工安全。
Combining with Zhaozhuang coal-special railway bridge engineering practice, the article introduces the critical points, construction technology and safety measures of prestressed beam slab construction with pretensional method, and points out that construction process should be strictly controlled, with a view to ensure construction security.
出处
《山西建筑》
2012年第28期192-193,共2页
Shanxi Architecture
关键词
先张法
预应力桥梁板
施工工艺
安全措施
pretensional method, prestressed beam slab, construction technology, safety measure