介绍某电厂4×600MW氢内冷汽轮发电机组安装阶段控制其漏氢量的措施和具体的实施情况。
This paper introduced the hydrogen leakage control measures of a power plant which got 4×600MW hydrogen inner cooled turbogenerator at its installation phase, expounded the specific implementation and the actual effect.
出处
《贵州电力技术》
2012年第8期45-47,共3页
Guizhou Electric Power Technology
关键词
安装工艺
发电机
漏氢量
影响
installation process
generator
hydrogen leakage
effect