摘要
结合工程实例,通过对现浇简支箱梁支架方案的分析比较,利用现浇支架法对900 t预应力简支箱梁进行了施工,从地基处理、支架搭设及预压、箱梁施工及预应力张拉等方面进行了论述,为类似工程施工积累了经验。
Combining with the engineering examples,the paper adopts the cast-in-place support method to construct the 900 t prestressed simply-supported box girder by analyzing and comparing the cast-in-site simply-supported box girder support scheme,and indicates from the foundation treatment,the support erection and prestress,the construction of box girder,and the prestressed tension,so as to accumulate experience for similar projects.
出处
《山西建筑》
2012年第29期124-125,共2页
Shanxi Architecture
关键词
箱梁
支架法
张拉
预拱度
box girder
support method
tension
camber