多项目管理中依据资源的马氏链择优 被引量:5

Markov chain optimal method base on resources in multi-project management
原文传递
导出
摘要 对众多需要实施项目进行优化选择.找出合理的优先级标准的方法,是进行多项目管理研究中需要解决的关键问题.针对有限资源限制和众多项目需要实施的决策管理,作者研究依据项目间资源转移矩阵找出优先级标准,从项目设计和已实施的项目中提取项目间资源转移关系,通过量化处理后构造资源转移概率矩阵,则与该资源变化矩阵对应的马尔科夫链的平稳分布即为项目最终占用资源的比例序列或项目的影响程度序列;以此作为评价项目优先级的标准,确定项目重要程度的排序. During the multi-project management research, finding out a reasonable priority standard to perform the optimization section of multi-project is the key issue that needs to be carried out. For the decision management of limited resources and numerous projects, the author provides the priority standard according to the transition matrix of resources among projects. And extract the transition relations of resources from the projects designed and implemented, then structure transition probability matrix of resources through quantifying the transition relations of resources among projects, the stationary distribution of the Markov chain which is corresponding to the resource matrix, is the ration sequence of final resources occupation or the influence level sequence; the authors take it as the criteria of evaluating the priority of projects and determining the ranking of significance.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2012年第9期1953-1957,共5页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(10671197)
关键词 多项目管理 马氏链 平稳分布 项目排序 multi-project management Markov chain stationary distribution ranking for projects
  • 相关文献

参考文献10

二级参考文献61

共引文献155

同被引文献55

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部