期刊文献+

基于模糊综合评价的核电设备采购管理成熟度模型研究 被引量:4

Purchasing Management Maturity Model of Nuclear Power Equipment Based on Fuzzy Comprehensive Evaluation
下载PDF
导出
摘要 以核电建设项目设备采购管理为研究对象,分析了设备采购工作的重要性与复杂性,借鉴项目管理成熟度模型的研究方法,构建了核电设备采购管理成熟度模型,对模型的框架、内容及评价方法进行了定义。针对核电设备采购的特殊性,构建了采购管理综合评价指标体系,采用基于AHP的模糊综合评价法对其进行评价和实证分析。研究结果为提高核电设备采购工作的战略性管理水平提供了重要的管理理论、标准和工具。 Nuclear power equipment purchasing management, as the research object, the importance and complexity of the procurement of equipment is analyzed. And then, a purchasing management maturity model is constructed based on precious relative methods, besides the frame, contents and evaluation method are also defined. Taking the special nature of nuclear power equipment procurement into account, an index system of purchasing management maturity comprehensive evaluation is proposed, also with an evaluation method based on fuzzy comprehensive evaluation and AHP. The results provide a direction for the strategic management of the nuclear power equipment procurement, and also an important management theory, standards and tool.
作者 杨玲玲
出处 《陕西电力》 2012年第8期58-61,65,共5页 Shanxi Electric Power
关键词 核电设备 采购管理 成熟度评价 蛛网模型 nuclear power equipment purchasing management maturity assessment cobweb model
  • 相关文献

参考文献7

二级参考文献16

共引文献31

同被引文献25

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部