摘要
针对处于规划阶段或者初步设计阶段的民用建筑,在冷却塔方案尚未确定时,应该结合建设项目的实际情况,从环境影响评价的角度,对冷却塔的选址、选型及噪声影响因素进行全面的分析,并结合建筑物本身及周围状况对冷却塔提出技术上可行、经济上合理的降噪措施,为建设项目的环境管理和环保审批提供行之有效的技术支撑。
Referring to the status that the program of cooling tower has not yet been determined when the planning stage or the preliminary design level of civil construction, a comprehensive analysis of cooling tower's position, type selection of equipment and effects of cooling tower's noise from the point of view of EIA should be made,combined with the actual situations of the construction project. Meanwhile, considered the conditions of construction and surroundings of the construction, the technically and economically reasonable measures for reducing noise were put forward, it is an effective technical support for environmental management, examination and approving of construction projects.
出处
《环境保护与循环经济》
2012年第8期58-60,共3页
environmental protection and circular economy
关键词
冷却塔
环境影响评价
噪声
降噪措施
cooling tower
environmental impact assessment(EIA)
noise
noise reduction measures.