摘要
介绍了成都地铁列车到段后的调试情况,以及在进行各项试验中遇到的大坡道调车作业、车辆速度传感器接地故障、制动电阻温升以及防滑等问题及其解决措施,并对部分问题进行了分析。
The debugging and test are described after Chengdu Metro vehicles entering the depots. Problems in the debugging and testing operation, such as the shunting on large slope, earthing troubles of on-board speed sensors, temperature rise of breaking resistors are detected and solutions for them are analyzed theoretically.
出处
《城市轨道交通研究》
北大核心
2012年第9期134-136,共3页
Urban Mass Transit
关键词
地铁
列车
调试
试验
metro
vehicles
debugging
test