7P. Kang, D. Birtwhistle. Condition moni- toring of power transformer on- load tap changers. Part 2: Detection of aging from vibration signatures. IEE Proceeding on Generation, Transmission and Dis- tribution. 2010, 148 (4) .
8P. Kang, D. Birtwhistle. Condition moni- toting of power transformer on- load tap changers. Part 1: Automatic condition monitoring. IEE Pro- ceeding on Generation, Transmission and Distribu- tion. 2010, 148 (4) .
9P. Kang, D. Birtwhistle. Condition as- sessment of power transformer on-load tap changers using wavelet analysis. IEEE Transactions on Power Delivery. 2001, 16 (3) .
4C Bengtsson. Status and Trends in Transformer Monilaring [J]. IEEE Trans. on Power Delivery, 1996, 11(3): 1 379-1 384.
5Kang, D Birtwhistle. Condition Monitoring of Power Transformer On-load Tap-changers. Part 1: Automatic Condition Diagnostics[J]. IEE Proe.-Gener. Trans. Disturb., 2001, 148(4):301-306.
6DL/T-574-95有载分接开关运行维修导则,1995年
7Bengtsson C. Status and trends in transformer monitoring[J]. IEEE Trans. Power Deliv., 1996,11 (3): 1379-1384.
8Kang P., Birtwhistle D. and Daley J. Non-invasive online condition monitoring of on-load tap changers [C].Proceedings of the IEEE Power Engineering Society Winter Meeting, 23-27 January 2000,3:2223-2228.
9Kang 1". Birtwhistle D. Condition monitoring of power transformer on-load tap changers. Part l:Automatic condition monitoring[J], lEE Proc. Gen. Transm. & Distrib. 2001,148(4):301-306.
10Kang P, Birtwhistle D. Condition monitoring of power transformer on-load tap changers. Part 2:Detection of aging from vibration signatures [J]. IEE Proc. Gen.Transm & Distrib. 2001,148(4):307-311.