期刊文献+

铁路大型箱梁预制场规划与布置 被引量:4

Planning and Layout of Precasting Yard for Large-scale Railway Box Girder
下载PDF
导出
摘要 随着高速铁路建设的发展,双线900t预应力整孔箱梁对制梁场的标准化、工厂化建设要求也越来越高,因此,在梁场建设中必须坚持"整体设计、系统建设、优质高效、一次建成"的方针,坚持系统性、先进性、经济性、合理性与实用性相结合的原则,达到"一流的设计、一流的工程、一流的技术装备"的建设目标。文章结合京沪高速铁路及大西客运专线新制梁场的建设经验,从梁场选址、梁场规划布置设计和制梁设备的配备等方面对大型箱梁预制场的建设加以介绍。 With the development of high-speed railway in our country, a higher standard is required for the construction of normalized and industrialized precasting yard to cast 900 t prestressed whole-span box girder for a double line railway. Therefore, the construction of girder yard must stick to the policy of "integral design, systematical construction, high-quality and high efficiency, completion in one time" and the principle of "integrating systematicness, advancement, economy, rationality and practicality" to reach the construction target of "first-class design, first-class engineering and first-class technical equipment". Combined with the construction experience of girder yard for Beijing-Shanghai high-speed railway and Datong-Xi'an Passenger Dedicated Line, The paper introduces the construction of large-scale box girder precasting yard in respect of construction experience, site selection, planning, layout and design of girder yard and allocation of girder precasting equipment.
作者 高军
出处 《高速铁路技术》 2012年第4期74-77,共4页 High Speed Railway Technology
关键词 高速铁路 客运专线 大型箱梁预制场 规划与布置 high-speed railway passenger dedicated line precasting yard for large-scale box planning and layout
  • 相关文献

二级参考文献14

共引文献25

同被引文献13

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部