摘要
介绍应用在长春轻轨4号线FZL100型FZL·H10型TWC设备工厂测试环境下的具体实施方案,用于指导TWC设备系统出厂测试工作。本方案从系统原理、硬件接口、技术指标详细分析测试方案的实现以及测试步骤。
The paper introduces the specific implementation scheme of FZL100 H10 TWC equipment applied in Changchun light rail line 4 under factory test environment,for guiding the factory test of TWC equipment system.In the scheme,the implementation of the testing plan and procedures are introduced from the system principle,hardware interface,technical indicator analysis.
出处
《铁路通信信号工程技术》
2012年第4期54-56,共3页
Railway Signalling & Communication Engineering