摘要
招宝山隧道作为我国第一座超小净距 (<0 .2 8B)并行隧道的实践工程 ,准确掌握隧道在不同施工过程中的力学状态 ,是该工程成败的关键。为此 ,在设计前对隧道施工状态进行了有限元数值计算模拟 ,施工中对地面沉降、洞周收敛、拱顶下沉、岩体位移、围岩压力、支护结构应变、围岩松弛范围及爆破破坏深度等进行了系统测试工作 ,有力地保证了这一设计施工新技术的顺利实施 。
Zhaobaoshan road tunnels are the first twin tunnels with small spacing in China. The length, width B and height of the tunnels are 169, 14.15 and 12.35 m, respectively. The clear distance between twin tunnels is less than 0.28 B. In design and construction, it is critical to grasp the mechanic characteristics of the twin tunnels under different construction processes to insure successful work. Therefore, the mechanical characteristics are studied by FEM before design, and during construction, and systematic measures are performed, including ground surface settlement, convergence, crown settlement, ground displacement, earth pressure, support structure deformation, loosen zone, and broken depth due to explosion.