摘要
随着电力需求的发展,山区电网建设也相应迅速发展。山区复杂场地变电站地基处理成为影响变电站建设,电网发展的重要因素。目前,国内外针对山区复杂场地填方地基的变形及稳定性研究缺乏深入系统的研究成果。本文试通过对山区拟建场地低洼部分回填土的使用及加固处理所采用方法的研究,提出适合山区变电站回填土地基压实控制的标准,为相关规范的修订和完善提供有价值的数据、佐证材料和建议。
W ith the development of the electric power demand,mountain grid construction also corresponding rapid development . Mountain complex site substation foundation treatment become important factors of substation construction and power grid development. At present, for complex mountainous area at home and abroad field embankment foundation deformation and stability study lack of deep research results . Through analyzing the backfill and reinforcement of mountain proposed site low-lying parts , put forward suitable for mountain substation backfill soil foundation compacted control standard, for related and revision of the norm provide valuable data, evidence materials and suggestions.
出处
《科技信息》
2012年第29期358-362,共5页
Science & Technology Information