对大型抽水蓄能电站首机首次水泵工况启动试验方式关注的主要技术问题进行了探讨,重点研究了9个技术难点和特点问题,提出了分析意见和初步结论。
Typical technical issues on test modes of first startup of first unit of the large-sized pumped storage power station at pump operating condition are discussed. 9 technical difficult and key points are studied specially. Correspondingly, analyzing comments and primary conclusions are provided.
出处
《西北水电》
2012年第S01期69-73,共5页
Northwest Hydropower
关键词
抽水蓄能
首机首次
水泵工况
启动试验
技术问题
Pumped storage
first unit first time
pump operating condition
startup test