期刊文献+

斐济南德瑞瓦图水电站配水环管保温保压浇筑

Concrete Placement with Heat Insulation and Pressure Maintaining for Looped Water-Distribution Pipe
下载PDF
导出
摘要 在高水头机组中蜗壳和配水环管保压浇筑混凝土施工技术目前已广泛应用,但同时采取保温浇筑的却很少。文章介绍了斐济项目配水环管保温保压浇筑混凝土的方案及施工过程数据,经论证,保温保压浇筑有利于水电站的长期安全可靠运行。 Construction technology on concrete placement with pressure maintaining for spiral case and water distribution looped pipe of high-head turbine-generator units is widely applied cmTently. But concrete placement with heat insulation and pressure maintaining sim- ultaneously is seldom utilized. In this paper, scheme and construction process data on concrete placement with heat insulation and pressure maintaining simultaneously for looped water-distribution pipe of Nadarivatu Hydropower Project, Fiji are introduced. Through demonstration, the construction method of concrete placement with heat insulation and pressure maintaining simultaneously benefits longterm, safety and reliable operation of the hydropower stations.
作者 杨富超
出处 《西北水电》 2012年第S01期195-197,共3页 Northwest Hydropower
关键词 配水环管 保温保压 方案 数据 :Looped pipe for water distribution heat insulation and pressure maintaining scheme data
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部