刘家峡水电厂1号机转轮更换前后稳定性分析 被引量:1

Analysis on Stability of Unit 1 Runner before and after being Replaced,Liujiaxia Hydropower Plant
下载PDF
导出
摘要 阐述了刘家峡水电厂1号机转轮更换前后机组的稳定运行情况,介绍了1号机原转轮叶片裂纹情况、补焊修复措施,并根据转轮更换前后机组稳定性试验数据,分析了机组在不同负荷区域的稳定性能。 Stability of Unit 1 runner before and after being replaced, Liujiaxia Hydropower Plant is described. Cracks and their welding repair of the original Unit 1 runner blades are introduced. Furthermore, stability performances of units at different loads are analyzed according to test data on stability of units with the runner before and after being replaced.
机构地区 刘家峡水电厂
出处 《西北水电》 2012年第S01期198-201,共4页 Northwest Hydropower
关键词 转轮 裂纹 稳定性 Runner crack stability
  • 相关文献

参考文献4

二级参考文献4

  • 1D Oechsle, R Fisher, W Gfeller,Li Chen. Liu Jia Xia Runner Cracking Root Cause Investigation(刘家峡转轮裂纹原因分析报告)[R],2003.
  • 2K Winkler, L Kunz, Liu Jia Xia Buckets Mechanical, Chemical and Fractologic Test Report[R]. 2003.
  • 3曹剑绵,陈昌林.大型水轮机转轮异常振动及叶片裂纹分析[M].成都:西南交通大学出版社,2002,68~72.
  • 4赵耀,董开松.刘家峡水电厂1号机噪声特性试验报告[R].甘肃电力科学研究院.

共引文献15

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部