摘要
简要介绍了水布垭水电厂调速器压油系统电气控制原理,在实际运行过程中程序的完善以及对卸载和软启动过程的探讨。
Principle of electric control of pressure oil system of speed governor, Shuibuya Hydropower Plant, program improvement in their practice process, and discussion on unloading and soft start are briefly introduced.
出处
《西北水电》
2012年第S01期215-217,223,共4页
Northwest Hydropower
关键词
过程控制
策略
卸载
软启动
Process control
strategy
unloading
soft start