摘要 通过对各类项目的长期调查研究,给出了包括项目质量、范围、成本和时间在内的项目四个"硬"要素的科学配置关系和分步集成方法的研究结果。这四个项目要素的科学配置关系是在项目资源约束下的四要素间客观匹配关系的描述,而它又具有各种不同的要素目标优先序列。作为实现这四要素科学配置关系的途径和手段,基于配置关系与集成的关系,提出了项目四要素两两分步集成的基本方法和技术,为项目集成管理提供了借鉴。 Based on the results from long-term survey and research about kinds of projects, the scientific configu- ration relation and 'step by step' integration method about four hard factors of the project--quality, cost, time and scope were stated. The scientific configuration relation on these factors is the description of the objective relation, which based on specific resource constraints and with different objective priority sequences. As the process and ap- proach to achieve this configuration relation, basic method and technique of 'step by step' integration are stated based on the relation between integration and configuration relation, which can be the reference to project integra- tion management.
作者 戚安邦 尤荻
机构地区 南开大学商学院
出处 《科学学与科学技术管理》 CSSCI 北大核心 2012年第10期26-30,共5页 Science of Science and Management of S.& T.
基金 教育部人文社会科学研究项目"EVM方法在我国军事装备项目管理中的应用机制与技术方法研究"(10JA630474)
关键词 项目四要素 科学配置关系 项目集成 目标优先 分步集成 project four factors scientific configuration relation project integration objective priority 'step bystep' integration
  • 相关文献

参考文献10

  • 1Fleming Q W, Koppelman J. Earned Value Project Mana- gement[M]. 3rd Edition. Newtown Square: Project Man- agement Institute, 2005.
  • 2戚安邦.项目挣值分析方法中的错误与解决方案[J].数量经济技术经济研究,2004,21(5):63-68. 被引量:62
  • 3Babu A G, Suresh N. Project management with time, cost, and quality considerations[J]. Journal of Operational Rese- arch, 1996,88(2):320-327.
  • 4Khang D B, Myint Y M. Time, cost and quality trade- off in project management: A case study[J]. International Journal of Project Management, 1999,17(4):249-256.
  • 5Iranmanesh H, Skandari M R, Allahverdiloo M. Finding Pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling[J]. World Academy of Sci- ence, Engineering and Technology, 2008(40):346-350.
  • 6E1-Rayes K, Kandil A. Time-cost-quality trade-off analy- sis for highway construction[J]. Journal of Construction, Engineering Management, 2005, 131(4):477-485.
  • 7戚安邦.多要素项目集成管理方法研究[J].南开管理评论,2002,5(6):70-75. 被引量:117
  • 8Atkinson R. Project management: Cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria[J]. International Journal of Project Management, 1999,17(6):337-342.
  • 9Kerzner H. Project Management: A System Approach to Planning Scheduling and Controlling[M]. 8th Edition. Hob- oken: John Wiley & Son's, 2003.
  • 10Cioff D F. Managing Project Integration[J]. Managem- ent Concepts International, 2002.

二级参考文献15

  • 1Christensen, Davis S., "The Costs and Benefits of the Earned Value Management Process", Acquisition Review Quarterly, Fall, 1998.
  • 2Project Management Institute, A Guide to Project Management Body of Knowledge, PMI, 1996 Edition & 2000 Edition.
  • 3Fleming, Quentin W., Cost/Schedule Control Systems Criteria: The Management Guide to C/SC-SC, Chicago, Illinois: Probus Publishing Co., 1992.
  • 4Cass, Donald J., "Earned Value Program for DOE Projects", AACE-I TRansactions, 1998.
  • 5Project Management Institute, A Guide to The Project Management Body of Knowledge, PMI Standard Committee, 2000.
  • 6Fleming, Quentin W., Cost/Schedule Control Systems Criteria: The Management Guide to C/SCSC, Chicago, Illinois: Probus Publishing Company, 1992.
  • 7Navy, Special Projects Office, Bureau of Ordnance, Department of the Nevy, Project PERT, Washington DC. 1958.
  • 8NASA, Office of the Secretary of Defense and National Aeronautic and Space Administration. DOD and NASA Guide PERT/COST, Washington, DC. 1962.
  • 9Fleming, Quentin W., and Joel M Koppelman, "Earned Value Project Management", Cost Engineering, Vol.39, No.2, Feberary, 1997.
  • 10Abba, Wanyne Y., "Earned Value Management—Reconciling Government and Commercial Practices: For People Involved in Earned Value—Government, Industry, Academic, or Consulting—These Are Exciting Times", PM: Special Issue, January-February, 1997.

共引文献163

同被引文献52

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部