期刊文献+

序批式垂直潜流人工湿地处理农村生活污水 被引量:5

Cyclic Batch Subsurface Wetland for Treating Rural Sewage with Low Carbon-to-Nitrogen Ratio
原文传递
导出
摘要 通过改进人工湿地的运行方式设计研发了一种序批式垂直潜流人工湿地(CBW),并将其与传统潜流人工湿地低浸润线和高浸润线运行方式的处理效果进行了对比。CBW对TN和TP的去除率最高,分别为30.85%和52.59%;对氨氮和COD的去除率仅次于低浸润线运行方式的,分别为80.75%和70.14%。CBW处理低碳高氮农村污水的最佳水力负荷为0.1 m3/(m2·d),并且在连续两个月的运行中处理效果较稳定,出水COD和NH4+-N浓度均能达到《城镇污水处理厂污染物排放标准》(GB 18918—2002)的二级标准,为CBW在农村地区的推广应用提供了理论依据。 A novel vertical flow constructed wetland system, named cyclic batch subsurface wetland (CBW) , was developed by modifying the operation of the constructed wetland. The treatment efficiencies of CBW and conventional constructed wetlands operated under high and low water level conditions were compared. Among the three operation modes, CBW achieved the highest TN and TP removal rates, 30. 85% and 52.59% respectively. The removal rates of NH4 - N and COD by CBW were 80.75% and 70.14% respectively, only lower than those by constructed wetland operated under low water level condition. The optimal hydraulic loading of CBW for treating rural sewage with low carbon-to-ni- trogen ratio was 0.1m^3/(m^3·d). Stable performance of the CBW system continued for two months.The effluent concentrations of NH4+ - N and COD met the second criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant ( GB 18918 - 2002).
出处 《中国给水排水》 CAS CSCD 北大核心 2012年第19期8-11,共4页 China Water & Wastewater
基金 国家水体污染控制与治理科技重大专项(2010ZX07320-002) 北京建筑工程学院校设科学研究基金资助项目(101200902) 上海市科学技术委员会攻关项目(06dz12311)
关键词 序批式人工湿地 农村污水 水力负荷 cyclic batch subsurface wetland rural sewage hydraulic loading
  • 相关文献

参考文献3

  • 1吴振斌,成水平,贺锋,付贵萍,金建明,陈辉蓉.垂直流人工湿地的设计及净化功能初探[J].应用生态学报,2002,13(6):715-718. 被引量:113
  • 2徐祖信,王晟,李怀正.序批式潜流人工湿地污水处理工艺[P].中国专利:200510028580.6,2005-08-08.
  • 3Sun Guangzhi, Zhao Yaqian, Allen S. Enhanced removal of organic matter and ammoniacal-nitrogen in a column experiment of tidal flow constructed wetland system[J]. J Biotechno1,2005,115 (2) : 189 - 197.

二级参考文献6

  • 1[1]Brix H.1994.Use of constructed wetlands in water pollution control: Historical development,present status,and future perspectives.Water Sci Tech,30(8): 209~223
  • 2[2]Cheng S-P(成水平),Xia Y-C(夏宜王争).1998.Studies on the artificial wetland with cattale and rush Ⅲ.Purification mechanism.J Lake Sci,10(2):66~71(in Chinese)
  • 3[3]Chinese EPA (国家环境保护局).1989.Methods of Water and Wastewater Determination.3rd edit. Beijing:China Environmental Science Press.(in Chinese)
  • 4[4]Cooper PF and Green B.1995.Reed bed treatment systems for sewage treatment in the united kingdom -The first 10 years' experience.Water Sci Tech,32(3):317~327
  • 5[5]Fetter CWJr,Slooy WE,Spangler FL.1976.Potential replacement of septic tank drain fields by artificial marsh wastewater treatment systems.Ground Water,14(6):396~401
  • 6[6]Hartog CD,Kevt J,Sukopp H.1989.Reed.A common species in decline.Aquatic Bot,35:1~4

共引文献113

同被引文献69

引证文献5

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部