自升式海上风电安装船升降控制系统的设计 被引量:8

The Design of Jacking Control System of Self-Elevating Offshore Wind Turbine Installation Vessel
下载PDF
导出
摘要 升降控制系统是自升式风电安装船升降装置中的关键部分,其稳定性是桩腿和船体平台顺利实现升降的保证。采用基于PROFIBUS-DP现场总线的PLC控制系统及分布式控制策略,进行海上风电安装船体和桩腿的升降控制、调节船体平衡状态,并通过运行在上位机的WinCC组态软件实现对风电安装船的全过程监控,包括液压系统的工作压力、工作油温、油箱液位等现场设备的工作状态和故障信息。试验运行表明,该系统可靠性和安全性高,结构简单,能够满足船体平台的升降要求。 Jacking control system is a key part of self-elevating offshare wind turbine installation vessel, whose stability guarantees the smoothly lifting and dropping of legs and vessel platfor.Jacking control system adopts the control system of PLC which is based on PROFIBUS-DP field bus and the distributed control strategy to achieve the control of lifting and dropping of vessel and legs ,regulating the balance of the vessel.In addition,the operation of WinCC configuration software in the upper computer fulfills the whole process of monitoring the wind turbine installation vessel, including working condition and fault information of field device such as the working pressure, oil temperature and liquid level of hydraulic system. Through the research,it is proved that the control system has the advantages of high reliability, safety, and simple structure ,satisfying the jacking requirements of the vessel platform.
出处 《机械设计与制造》 北大核心 2012年第9期54-56,共3页 Machinery Design & Manufacture
基金 江苏省科技支撑计划(BE2009118) 江苏科技大学研究生创新计划资金资助
关键词 分布式控制 PROFIBUS-DP 平衡控制 Distributed Control PROFIBUS-DP Automatic Balance Control
  • 相关文献

参考文献9

二级参考文献18

  • 1马翠红,张涌涛,纪玉荣.基于组态软件的加热炉生产过程的实时监控系统[J].自动化仪表,2004,25(11):60-62. 被引量:15
  • 2张晓杰,陈玉红,陈鹏.计算机在设备管理中的应用[J].中国井矿盐,2005,36(2):44-45. 被引量:1
  • 3颜文俊,毛雪珍.基于PLC与WinCC的电站远程自动监控系统设计[J].机电工程,2005,22(3):33-36. 被引量:14
  • 4谭跃.PLC在自升式海洋平台起升装置的应用.中国造船工程学会修船技术学术委员会优秀论文集[M].中国修船编辑部,1998.434-437.
  • 5Lars Nedergaard. Taking Windpower Offshore-Transport, Installation and Service Support of Offshore wind turbines[EB/OL], http://www.a2sea.com, 2008-4.
  • 6Gerhard Gerdes Albrecht Tiedeman drs. Sjoerd Zeelenberg. Case Study: European Offshore Wind Farms- A Survey for the Analysis of the Experiences and Lessons Learnt by Developers of Offshore Wind Farms -Final Report [R/OL]. http://theses.lub.lu.se/archive, 2006.
  • 7Gusto MSC. Jacking system fog'Resolution" [EB/OL]. http://GustoMSC.com, 2009-1.
  • 8Schutz, W, Schroter, E Development of heavy steel plate for Mayflower Resolution, special purpose vessel for erection of off shore wind towers[J]. Materials Science and Technology. 2005, 21 (5):590-596.
  • 9Wtm de Boom. Promising Offshore Assembling, Transport and Installation Techniques [EB/OL]. http://www. GustoMSC. com, 2009-1.
  • 10谭跃,中国造船工程学会修船技术学术委员会优秀论文集,1998年,434页

共引文献87

同被引文献29

引证文献8

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部