通过总结内蒙古苏尼特风电项目现场调试过程中的实际经验,介绍了上海电气研制的低温型2MW风力发电机组的主控系统,重点描述了现场调试过程中发现的问题和故障,对相应的处理进行了分析。
TThis paper summarizes the practical experience in the Inner Mongolia Sonid wind power project, introduces the main control system of the Shanghai Electric low temperature 2MW wind turbine unit. It describes the problems and equipment failures found in the adjustment process, were analyzed and summarized the corresponding treatment.
出处
《装备机械》
2012年第3期53-58,共6页
The Magazine on Equipment Machinery
关键词
风力发电
主控系统
现场调试
wind power
main control system
on-site commissioning