摘要
介绍了DCS系统由SmartPro系统升级到MACSV系统在300MW机组的应用实例。分析了升级的原因,介绍了升级技术方案、调试工作及取得的效果。
In this paper, an application example, DCS from SmartPro upgrade to MACSV in the practice of 300MW thermal power unit, was introduced. The upgrade reasons.technology solutions.commissioning work was analyzed and results achieved.
出处
《贵州电力技术》
2012年第9期38-40,共3页
Guizhou Electric Power Technology