摘要
阐述了在500kV大黔双回线、黔烽Ⅰ回线停电加固期间500kV黔烽Ⅱ回线路光差保护没有光纤通道,临时将黔烽Ⅱ回线路光差保护改造成载波保护运行,成功解决了在500kV大黔双回线、黔烽Ⅰ回线停电加固期间,黔烽Ⅱ回线路只单主保护运行。
This paper expounded the 500 kV Qianfeng Ⅱ back line had not fiber channel for optical differential protection during the 500 kV Daqian double line and Qianfeng Ⅰ back line at the time what power failure and reinforcement. Temporarily transformed Qianfeng Ⅱ back line optical differential protection into carrier protection operation, successfully solved the problem of Qianfeng Ⅱ back line only single primary protection operation during the 500 kV Daqian double line and Qianfeng Ⅰ back line power failure and reinforcement.
出处
《贵州电力技术》
2012年第9期81-82,40,共3页
Guizhou Electric Power Technology
关键词
光差保护
载波保护
保护改造
通道改造
optical differential protection
carrier protection
protection modification
channel reconstruction.