首钢矿业公司二马采区露天转地下挂帮矿开采方案选取 被引量:4

Mining methods selection of hanging wall ore in the case of open-pit mine turns into underground mine in Erma Mining Area
下载PDF
导出
摘要 首钢矿业公司二马采区挂帮矿开采是该采区露天转地下项目的前期工程,结合现场实际,对挂帮矿开采的开拓系统及采矿方法进行合理选择,达到尽早出矿、安全高效生产的目的,为此类开采设计及生产提供借鉴。 Mining of hanging wall ore body in Erma Mining Area of Shougang Mining Company is preliminary engineering of open-pit mine turns into underground mine. Combined with the mining status of Erma Mining Area, development system and mining methods are discussed to get a reasonable choice, in order to achieve the purpose of safe and efficient production as soon as possible, and provide a reference for similar designs and production.
作者 李大凯
机构地区 首钢矿业公司
出处 《有色金属(矿山部分)》 2012年第5期27-29,共3页 NONFERROUS METALS(Mining Section)
关键词 露天转地下 挂帮矿 开拓系统 采矿方法 open-pit mine turns into underground mine hanging wall ore development system mining methods
  • 相关文献

参考文献5

二级参考文献2

  • 1中冶京诚(秦皇岛)工程技术有限责任公司.马钢集团姑山矿业有限责任公司姑山铁矿边坡矿地下开采工程初步设计[R].2006,6.
  • 2解世俊.金属矿山地下开采[M].冶金工业出版社,1988.

共引文献11

同被引文献28

引证文献4

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部